SAP PM 初级系列8 – PM 组织架构

SAP PM 初级系列8 – PM 组织架构

1,SAP PM模块的典型组织架构如下示:

SAP PM 初级系列8 - PM 组织架构

2,SAP PM organizational structure includes the following organizational units(SAP PM模块组织结构包含如下的组织单元):

Client: Client is highest level of an organization structure. It includes all the subsidiaries within one corporate group.

Company Code: Each subsidiary is represented with a company code in SAP system. Each company code has its own balance sheet and P&L statement.

Plant is one the most important structures in SAP PM organizational structure. It is the place where manufacturing of products takes place. One company code can have multiple plants.

Maintenance Plant: Organizational unit where operational systems are installed is called a maintenance plant.

Maintenance Planning Plant: This is a plant at which the maintenance operations are planned. It is possible that requirements come from own plant or from another maintenance plant assigned to the maintenance planning plant. In most cases, the maintenance planning plant is same as the maintenance plant.

SAP PM 初级系列8 - PM 组织架构

Cross-Plant Maintenance

Plant section: A maintenance plant can be divided into subparts which are known as plant sections. For example, a plant can be divided into production area, store, electrical substation, etc.

Location: Location is the place where a functional object is physically installed in a plant section. It is used for informative purposes.

Maintenance Planner Group: It is a group of employees responsible for planning and processing of maintenance tasks in a plant. A different maintenance planner group is created for each plant.

Work Center: Work center is an organizational unit where maintenance activities are performed. It belongs to master data. Work center defines where and when the maintenance operation will be performed. Work center is assigned in task list, maintenance order, and maintenance operation line items. Machine/group of machine or person/group of people can be represented as a work center.

3,A work center is used for different purposes as follows(工作中心有如下用处):

Costing: There is link between a cost center and a work center. Costs can be calculated if a work center is assigned in a maintenance operation because the link to the cost center provides the activity type. In activity type, the rates are maintained on a variable basis or as fixed rates.

Scheduling: Scheduling is used determine start and end dates of maintenance operations based on a predecessor or successor operation. During scheduling, the start date and end date are calculated based on formulas maintained in the work center.

Capacity Planning: The formulas related to capacity planning are stored in the work center. In capacity requirement planning, the required capacity for operation is determined from the available capacity in the work center.

关于赛锐信息

作为SAP的资深合作伙伴,赛锐信息是一家专业提供SAP行业化管理软件解决方案的顾问公司,致力于为企业提供SAP ERP系统咨询服务、IT规划、业务流程优化、信息系统实施、行业信息系统方案开发,运营外包及售后维护等全面的服务方案。已服务1000+家不同行业、规模的大中小型企业客户。在电子高科技、汽车零部件、印刷包装、医疗器械、快消品、专业服务等行业信息化管理领域具有领导性地位。

相关新闻

联系我们

联系我们

130-0752-1773

在线咨询:点击这里给我发消息

邮件:info@sapzx.com

工作时间:周一至周五9:00-18:00,节假日正常休息

关注微信
关注微信
分享本页
返回顶部